Showing posts with label James Thompson. Show all posts
Showing posts with label James Thompson. Show all posts

Monday, November 12, 2018

The Library as a Hub of Learning (Part Three)


Since the school’s founding in 1892, the library has played a key role in supporting faculty research and student learning.  From its humble beginnings in a small classroom to its current prominent location at the center of campus, the library has sought to keep pace with emerging scholarly trends, changing researcher needs, evolving uses of technology, as well as a growing student population.  This third and final blog post about the history of the library at UNCG will examine the profound changes in its collections, services, access tools, and spaces between the years 1973 to 2013.

College Ave Entrance to Jackson Library

 By the start of the 1973 fall academic term, the multi-story tower project was completed and open to students.  The renovation of the 1950 portion of the library complex began in December 1973 and was completed within ten months.  The new library addition provided 119,000 square feet of floor space.  This new space increased the overall number of study carrels and public seating as well as shelving for books.  The library director Dr. James Thompson confidently declared that the new space was designed to house a total of one million volumes.  He expected the library to reach its storage capacity within 10 to 15 years.

Jackson Library and Statue of President McIver

 
During the 1970s, academic libraries were feeling the impact of new computer technology and resources.  In April 1977, Jackson Library offered a new service to its faculty.  Employing a computer terminal, library staff provided users with bibliographies that drew on forty computerized data files.   Thus, if a faculty member was looking to assemble a bibliography for a research project, they could pay a fee (ten to thirty dollars) for librarians to search data files and compile a single print out of a list of potential useful titles.  This service would allow the researcher to skip the task of looking up the titles of scholarly works in bound print indexes.  By the early 1980s, the library automated its serials list and joined a national inter-library loan network of 2,400 libraries.

Within six years of the completion of the construction and renovation projects, the library was reporting a space crunch.  Additional shelving units were being added on the floors of the new tower building.  To accommodate this new shelving, the library was forced to give up space for public seating and even some staff offices.  In 1982, the library reported that the library’s holdings of books approached 600,000.  Between 1970 and 1982, the library’s book holdings increased from 320,118 to 594,325.   The libraries total holdings of books, journals, and micro-texts grew from 466,999 in 1970 to 1,393,522 in 1982.  This rapid expansion of materials was intended to support the demands of an active research university.  Interestingly, the library director in 1982 gravely noted that due to the inflationary costs of books and journals as well as deep state budget cuts, the rate of purchases actually slowed thus preventing even a worse space crunch.   Along with collection growth, the library more than tripled its personnel and added new services that put additional strain on library space. 

Jackson Library Tower

 With steady advances in library technology, Jackson Library actively sought to adopt new practices and technologies to improve collection management and user services.   For example, the library undertook the reclassification of its entire holdings and moved from the Dewey Decimal System to the Library of Congress Classification System.  The goal of this 1983 project was to align with the best practices of its peer institutions.  In 1984, the library acquired its first public stand along “micro-computer.”  The computer was an IBM PC with twin diskette drives and a 10 megabyte hard drive.

In 1986, library moved forward in purchasing an integrated online computer system.  It was affectionately called JACLIN.  The acronym stood for Jackson Library Information Network.  It was an online catalog with circulation, acquisition, and serials components.  To support the adoption of this integrated system, the library in 1987 took on the challenge of assigning an individual bar code to each of its 700,000 books.  The library’s 70 staff members were tasked with affixing bar codes to books and inputting the data into the new automated system.  During the 1989 fall semester, the JACLIN system went live.  Books were now being checked out to patrons by scanning the code on the borrower’s University ID as well as on the book’s assigned bar code.  With twelve computer terminals installed within the card catalog area of the library, patrons could now gain instant access to an individual book’s circulation status and location.  The new library director Doris Hulbert noted that the automated system also allowed patrons to search if a book was located at any of the other UNC system school libraries.  With an estimated 9 million catalog cards stored in the catalog area, Hulbert remarked that “many of us have a great fondness for the card catalog, and there is some trepidation about seeing such an old friend go.  But once people get used to the old system, they’ll see how helpful it can be.”  In 1993, the library completed the removal of the wooden cabinets and cards of its old card catalog system.

With the removal of its card catalog, the library was able to free up space to accommodate new services and technologies.  In 1994, a teaching lab was developed to assist faculty and students on accessing online data bases.  The newly constructed space was named the Electronic Center for Information Technology and Instruction (CITI) lab.  It contained 20 multimedia NCR 486 computers, a computer file server, a projector, desks and chairs, and other support equipment. Along with the new classroom and equipment, the library hired its first electronic resources information librarian to teach students how to effectively locate and integrate online content into their research.  The designated information literacy sessions sought to nurture student critical thinking skills by comparing and contrasting traditional and electronic resources.  Recognizing the campus demand for access to personal computers in 1997, the library repurposed 7,200 square feet of space and partnered with the University’s Information Technology Services to establish a computer lab for students.  The space was called the Super Lab.  It was the largest open access computer lab on campus with 125 individual work stations.  

With opening of the University’s new Music Building in 1999, the library was able to move its music collections to a designated library space within the elegant modern structure.  Jackson Library still served as the central library for the campus.  But, the new music library served as a satellite library that met an important teaching and research need.  In 2012, the music library was named to honor Dr. Harold A. Schiffman who is a Greensboro native and music educator.  Schiffman made a $2 million planned gift to the University.  The library now began to refer to itself as University Libraries. 

Harold  Schiffman Music Library

 
During the decades following the construction of the tower, Jackson Library transformed itself to meet the research needs of its faculty and students during a time of rapid technological change.  Indeed, the budget of the library was shifting in terms of monies allocated towards the purchase of physical books and monies for the purchase of electronic resources.   To be sure, the library continued to purchase books.  In 2001, Jackson Library celebrated the purchase of its one millionth volume.  To mark this milestone, the library purchased a rare first edition of William Blake’s Illustrations of the Book of Job.  It was one of only 315 copies produced in 1826, a year before Blake’s death.  Including its one millionth volume, the library in 2001 had over 2.3 million items and over 140 databases and 3,000 web pages.   

The pace of change in libraries and in higher education caused by technology seemed to accelerate at the start of the new millennium.  Jackson Library strove to adopt additional access tools and services to support faculty research and student learning.  At the same time, the student population of the University was growing.  So, the number of folks using library resources was increasing.  Due to the heavy demand and steady increase in the student body, there were a number of conceptual plans were developed that envisioned the construction of new adjoining structures that accommodated new instructional spaces, collection storage, tech labs, and even a cafĂ©.  Yet, the price tag for these plans was of a significant dollar amount. 

In the mean-time, the Dean of University Libraries, Rosann Bazirjian, recognized that Jackson Library needed to do more with its current space.  In 2008, the library conducted a space assessment study to consider a number of smaller renovation projects.  These proposed projects included the construction of: an information commons, meeting spaces, storage space for special collections, as well as the relocation of the circulation desk.  Over the next five years, the library diligently acted on many of these proposed library enhancements.  In addition to these projects, the library identified an emerging need for a space to support students who create multi-media projects.  The new space would be called the Digital Media Commons (DMC).  Library staff would assist students with the development of web pages, digital images, digital video, and PowerPoint presentations.  In 2012, the library repurposed a collection storage area in its lower level to accommodate the DMC.  This renovated space housed a service desk, consultation rooms, four student collaboratories, numerous individual computer stations, scanning stations, a gaming lab, a presentation practice room, a recording space, and several digital editing rooms.  Within a year of its launch, the DMC would expand its services to include 3-D printers.

3-D Printer in the Digital Media Commons
 
This is the third and final blog post related to the history of the library at UNC Greensboro.  The three blog posts sought to document the critical role the library has played in supporting faculty research and instruction and student learning.  The library’s dedicated and skilled staff have always offered innovative solutions to meet emerging research trends, changing instructional and technical needs, and shifts in scholarly communication.

Monday, August 27, 2018

The Library as a Hub of Learning (Part Two)


Since the school’s founding in 1892, the library has played a central role in supporting faculty research and student learning.  From its humble beginnings of being located in a small classroom to its current massive holdings of analog and digital holdings, the library has sought to keep pace with emerging scholarly trends, changing researcher needs, evolving uses of technology, as well as a growing student population.  This second blog post about the history of the library at UNCG will examine the profound changes in its collections and space between the years 1945 to 1974.

Carnegie Library Building
At the time of the school’s celebration of its fiftieth anniversary in 1942, the Woman’s College of the University of North Carolina (UNCG) library was considered the largest woman’s college library in the South.  Its staff of eleven professionals supported the needs of 2,300 students and 300 faculty.  Yet, library administrators and college faculty declared that the current facility was “inadequate” in accommodating the growing collections.  The library’s director (Guy Lyle) and the Faculty Library Committee worked together to build a “case” for the construction of a new library building.  Lyle noted that the library had seen a marked growth in collections and patrons since 1923.  Drawing on its annual statistics over the past 20 years, Lyle found that the number of faculty had grown by 101%, the student body had grown by 75.9%, the number of titles in the collections had grown by 441%, and the over-all circulation of titles had grown by 175%.  Lyle also noted that the seating capacity of the library had only increased by 14.7% since 1923.  During the course of the war years (1941-1945), a number of Greensboro newspaper articles raised the issue of the library’s “space crunch” by referencing Lyle’s key talking point that the facility’s seating capacity had not kept pace with the growth of its student population.  Before Guy Lyle left to take a position at Louisiana State University in 1944, he had the Winston-Salem architecture firm of Northup and O’Brien develop drawings and a conceptual plan for a new library.  His successor, Charles M. Adams, would rely heavily on these designs as he advocated for a new building.   

In 1945, Woman’s College submitted a request to the North Carolina General Assembly for monies to build a new library.  Dr. Walter Clinton Jackson, Dean of Administration, stated that $380,000 was needed for the new structure.  As the Advisory Budget Commission considered this funding request, the library’s director Charles Adams continued to make his case to the general public.  Quoted in a December 1946 article in the school’s newspaper, Adams stated that the “present quarters are so crowded that it is nothing short of a shocking academic situation.”  Adams also noted that the current library could only seat 10% of the student body while the new library was expected to seat upward of 50% of the student body.  In this same article, it was mentioned that the cost of the new library now stood at $1,128,400.

With the North Carolina General Assembly approving this funding request in 1947, contractors quickly submitted bids for the $1.1 million dollar project.  The new building project was to be located on Walker Avenue between McIver and Forest Streets.  The city of Greensboro approved the permanent closing of this portion of Walker Avenue on campus.  While there was some local opposition to this shift in traffic patterns, a groundbreaking ceremony was held on September 27, 1948.  Surrounded by dignitaries, faculty, and students, Chancellor Walter Clinton Jackson wielded a pick axe and a shovel to formally mark the start of construction.  Jackson stated that the new building marked “the beginning of a new era of greater usefulness of the college to the people of the state.”  The building project started in earnest in October 1948 with the grading of the land.  The installation of steel girders took place throughout the winter months.  The building quickly took shape and was completed in March 1950.  During the College’s exam period in 1950, the library staff relocated the collections from the Carnegie library to the new space.  The College supplied canvas laundry baskets in which the books were packed in.  To expedite the moving of books from the second floor of the Carnegie building, the laundry baskets were sent down chutes into waiting moving trucks!  The new library building opened on June 5, 1950.

Walter Clinton Jackson Viewing the New Library Building
The structure was built to be fire-proof by employing a steel frame and reinforced concrete floors and roof.  All floors were designed for a live load of 100 pounds per square foot.  The floors were covered in terrazzo.  The building contained an elevator for staff to move collections between floors as well as a pneumatic tube system to assist with the sending of call cards to all floors for book retrieval.  Air-conditioning was only provided on the first floor of the three story building.  The exterior of the building featured sand-finish colonial face brick and white Georgia marble.  The main entrance of the library featured a marble columned portico.

The building was designed to meet the projected future growth of the student population from its current 2,300 students to 3,000 students.  The seating capacity was set at 1,384 seats (which included seats in the reading room, seminar rooms, study carrels, and lecture hall).  And, the building’s new book stacks areas now had the capacity to handle 300,000 titles which was more than double its current holdings.  The design also allowed for special services that ranged from seminar rooms for faculty, a small lecture space for book talks, a large lecture room for classes, a student lounge, and sound-proof rooms for audio listening.  Interestingly, access to the collections was restricted to those students who were given a “stacks permit” (mostly juniors and seniors).  

New Library Building, c. 1955
After ten years of service, the “new” library building was formally named the Walter Clinton Jackson Library in 1960 in honor of the former Chancellor.  At the same time, the building was already reaching its projected capacity for titles and patrons.  Indeed, the library was already installing extra shelving in the stacks areas as well as in seminar rooms to accommodate new acquisitions. 

With Woman’s College becoming a co-educational University in 1963, the library was now required to support new graduate programs and an ever-growing student population.  By 1964, the library’s director Charles Adams began to consider plans for an addition to the building.  To assist the planning process, Adams turned to the architecture firm, Odell and Associates of Charlotte, to develop a plan for the addition.  Odell and Associates recommended the construction of a ten-story structure to be located at the rear of the present library building.  The designers consciously designed a building whose features differed greatly from the more traditional brick and marble Jackson Library.  The bright white concrete clad tower embodied the architectural approach known as Brutalism.  Nevertheless, the two distinct buildings would be connected and function as one facility.  The designs and conceptual plan were submitted to the University and to the North Carolina General Assembly. 
Walter Clinton Jackson Library
In 1967, the General Assembly authorized funding of the addition.  However, it was only in 1969 that the General Assembly actually appropriated funds.  The leadership of the library changed in 1969-1970.  Charles Adams retired.  Elizabeth Holder served as the acting director until a search was completed.  Dr. James Thompson was hired in July 1970 to oversee the library and the coming building project.  He immediately began to work with the architects to realize the construction of the ten story addition and the renovation of the 1950 building.  The 1971 General Assembly allocated $4,240,000 to pay for the addition, along with $185,000 for renovations to the existing Jackson Library.  Additional funds were allocated to relocate the intersection of Walker Avenue and Forest Avenue to accommodate the new building.

Construction on the tower addition began in early February 1972.  At that time, the University had 6,983 students and its collections contained 614,098 items.  These numbers were more than double what had been planned for the original 1950 building.  The library’s director noted that “Jackson Library is a fine building” but that the goals of the University had changed.”  So, the current space was inadequate for instruction, collections, and research programs.  Thompson stated that the library addition would provide 119,000 square feet of floor space.  The addition would also increase the number of student seating as well as increase the number of student carrels from 49 to 271 spaces.   With the combined spaces of the current Jackson Library and the tower addition, Dr. James Thompson declared that there would be enough future growth space to house a total of one million volumes. 

Library Tower Under Construction, c. 1973
The tower project was completed in October 1973.  Starting in November 1973, the library staff moved 500,000 books to the tower addition.  The move would take place over three days.  During the entire move operation, the library remained open to meet the needs of its 7,856 students and 400 faculty.  With the books relocated, the construction project turned to renovating the 1950 portion of the library complex.  Those renovations would be completed in fall 1974.  At the completion of the construction and renovation projects, Dr. Thompson estimated that it would take UNC Greensboro 10 to 15 years to fill up the building with books at its present acquisition rate.  Thompson’s prediction was largely correct.  Over the next decade, the library would need to address advances in library technology, continued increases in student enrollment, space, and the growing costs of acquiring new collections.